Completed Clean Energy Materials & Manufacturing

Low Cost Nuclear Phase 1

In plain English

AI plain-English summary

A consortium of 10 organisations is designing a new type of small nuclear power station that could be built in factories and deployed in fleets from the 2030s. The problem is cost. Existing nuclear plants are expensive, bespoke projects that take over a decade to build. This project aims to prove that a standardised, factory-built small modular reactor can generate electricity at prices competitive with renewables and gas with carbon capture. The design incorporates digital technologies, modern production processes, and waste reduction systems from the outset. If successful, the consortium plans to deploy these low-carbon power stations across the UK and globally through the 2030s and 2040s. This would help the UK meet its carbon reduction targets while accessing an export market worth over £200 billion. The technologies and processes developed could also apply to other advanced nuclear designs, future fusion programmes, and major infrastructure projects. This is a proof-of-concept phase, lasting 16 months, to demonstrate that the design meets technical, commercial, environmental, and societal requirements before proceeding to full development.

View original technical description
The project’s goal is to investigate and develop innovative approaches to nuclear power station design that will enable the development of a new type of nuclear power station that can provide electricity at rates competitive with other technologies such as renewables and Gas with carbon capture and storage (CCS). The project focusses on incorporating the latest digital technologies, factory production processes and waste reduction systems into an integrated design development programme. This project will act as proof of concept that the resulting power station design would meet societal, environmental, technical and commercial requirements. The consortium of 10 organisations delivering the project are targeting successful delivery of this initial phase of work within 16 months. Upon successful completion of this project, the consortium intends to continue development of the novel small modular nuclear power station design; with the expressed goal of deploying a fleet of these cost effective, low-carbon power stations through the 2030s and 2040s both in the UK and around the world. Ultimately, this will enable the UK to meet its carbon reduction goals, address the global climate change challenge and access an export market worth in excess of £200Bn by the 2030s. Successful delivery of this project will yield technologies, processes and tools that are also applicable to other novel power station designs, such as advanced modular reactors (AMR), future fusion programmes and other major infrastructure programmes.

View the original record at the funder ↗

Related Research

Grants with similar aims, by meaning.

Energy-Use Minimisation via High Performance Heat-Power-Cooling Conversion and Integration: A Holistic Molecules to Technologies to Systems Approach
DIMES - Distributed Integrated Multi Use Energy System for urban developments
New Nuclear Manufacturing (NNUMAN)
EPSRC 1st Grant: "Compact Modular Multilevel Converters for Offshore Wind Integration"
Newton Fund - New Configurations of Power Converters for Grid Interconnection Systems

Original classification

CR&D Bilateral

Plain English summaries and category classifications on this site are generated by AI and may not perfectly reflect the original research.