Completed Clean Energy Engineering

Tidal DP Barge

In plain English

AI plain-English summary

A flat-top barge with a custom computer brain is being built to install tidal turbines in the roughest, fastest-flowing parts of the sea. Today, installing a tidal turbine array requires hiring a specialised offshore dynamic-positioning (DP) vessel—a ship that uses thrusters to hold position without anchors. These vessels are expensive, often costing hundreds of thousands of pounds per day, and are in short supply. This makes tidal energy projects financially unviable. The project aims to replace that costly ship with a much cheaper flat-top barge, fitted with a novel propulsion system and a bespoke DP controller that can keep it steady in strong currents and high waves. If the barge works, it could slash the cost of installing tidal turbines by allowing developers to charter a vessel at a small fraction of current DP vessel rates. That would make tidal stream energy—predictable, reliable renewable power—economically competitive for the first time. The partners include a marine contractor, a DP software developer, and a shipbuilder, so the design is grounded in real-world construction and operation. The result would be a quieter but critical shift in how offshore renewable energy gets built.

View original technical description
The project will develop and test a low cost Dynamic-Positioning barge installation vessel suitable for installing tidal turbine arrays at energetic and exposed tidal sites. The vessel will be based on a flat top barge with significant deck space and adequate craneage capacity to deploy a wide range of tidal devices of 1MW size and above with associated drilling equipment, umbilicals etc. The vessel will have a novel propulsion system and bespoke DP controller onboard designed to maximise the tidal and weather operating window of the vessel. The project aims to deliver a DP tidal array installation vessel that can be chartered at a small fraction of current offshore DP vessel rates. The partners are IT Power (project lead), KML (marine contractor & shipowner), Reygar Ltd (DP controller developer) and A&P (Falmouth based shipbuilders).

View the original record at the funder ↗

Related Research

Grants with similar aims, by meaning.

High Flow Installation Vessel
Pivoting Deck Vessel prototype construction
DEMOnstration for Tidal Industry DErisking
Tidal array cost reduction: Testing a removable nacelle design for DeltaStream Technology
PALM Charger

Original classification

Collaborative R&D

Plain English summaries and category classifications on this site are generated by AI and may not perfectly reflect the original research.