Completed Materials & Manufacturing Clean Energy

Deployment of End to End Process Control for Encirc’s Elton site (DEEP Control)

In plain English

AI plain-English summary

A single control system will link two container-glass furnaces and 14 forming lines at Encirc’s Elton site, allowing operators to cut energy use and reduce defects in real time. Currently, the furnace and forming sections of the production line operate in isolation. When a problem emerges in the forming area—such as a defect that creates waste glass—the furnace operators do not learn about it until later, so they keep the furnace running hotter than necessary as a safety margin. That wastes energy and increases carbon emissions. The project closes this communication gap by deploying a MindSphere platform and Mendix-based dashboard that integrates both areas into one system. Operators can then spot trends and correct processes before defects occur, safely lowering the furnace’s energy safety margin. If successful, the project will cut the site’s annual CO₂ emissions by more than 15 kilotonnes. The integrated control system also creates a foundation for future decarbonisation steps, such as switching to hydrogen fuel or making lighter containers that require less raw material. For a large industrial site, this kind of end-to-end process control could become a template for energy-intensive manufacturing more broadly.

View original technical description
The 'Deployment of End to End Process Control for Encirc's Elton site (DEEP Control)' project will deliver energy savings through deployment of new end-to-end control systems linking processes across the two Encirc Elton container-glass furnaces and associated 14 forming lines to facilitate: 1. Optimisation of furnaces to run at minimum energy whilst maintaining glass quality 2. Increased packed-to-melt efficiency through reduced defects/rejects in forming processes 3. Estimated total annual CO2 savings of more than 15kT/year Lack of communication between current furnace and forming areas of the production line delays feedback of issues, delaying corrective action and improvement opportunities. This project will use a MindSphere platform and Mendix-based dashboard to deploy new furnace and forming-section control systems, integrating both areas of the production process into one system. This will enable operators to maximise process efficiency through safely reducing the energy safety-margin required for reliable furnace operation. It will also help operators to identify operational trends so that processes can be corrected before defects occur. These control systems will be refined and optimised through a series of whole-line production trials. The new control systems to be deployed will be an enabler for implementation of future decarbonisation opportunities, e.g. hydrogen fuels and light-weighting of containers.

View the original record at the funder ↗

Related Research

Grants with similar aims, by meaning.

ECO-SPRINT: Environment Centred Optimisation of SME Productivity using Realtime INTelligence
Enhanced Liquid Immersion Power Systems
SINDRI: Synergistic utilisation of INformatics and Data centRic Integrity engineering
Smart People + Smart Process = Smart Factory
InTiFi - Industry 4 Technologies into Foundation Industries

Original classification

Collaborative R&D

Plain English summaries and category classifications on this site are generated by AI and may not perfectly reflect the original research.