Deployment of End to End Process Control for Encirc’s Elton site (DEEP Control)
In plain English
AI plain-English summaryA single control system will link two container-glass furnaces and 14 forming lines at Encirc’s Elton site, allowing operators to cut energy use and reduce defects in real time. Currently, the furnace and forming sections of the production line operate in isolation. When a problem emerges in the forming area—such as a defect that creates waste glass—the furnace operators do not learn about it until later, so they keep the furnace running hotter than necessary as a safety margin. That wastes energy and increases carbon emissions. The project closes this communication gap by deploying a MindSphere platform and Mendix-based dashboard that integrates both areas into one system. Operators can then spot trends and correct processes before defects occur, safely lowering the furnace’s energy safety margin. If successful, the project will cut the site’s annual CO₂ emissions by more than 15 kilotonnes. The integrated control system also creates a foundation for future decarbonisation steps, such as switching to hydrogen fuel or making lighter containers that require less raw material. For a large industrial site, this kind of end-to-end process control could become a template for energy-intensive manufacturing more broadly.
View original technical description
View the original record at the funder ↗
Related Research
Grants with similar aims, by meaning.
Original classification
Collaborative R&DPlain English summaries and category classifications on this site are generated by AI and may not perfectly reflect the original research. Is something wrong? Let us know