Recipient organisationOffshore Renewable Energy CatapultSource-published name: Offshore Renewable Energy Catapult
Funding£33.5M
PeriodMar 2010 — Dec 2014
In plain English
AI plain-English summary
A 20-pod offshore wind farm in the North Sea will serve as a test site where companies can install prototype turbines and foundations in water depths ranging from 15 to 55 metres. Currently, manufacturers building larger turbines cannot secure onshore sites for testing due to size, noise, and visual constraints. This creates an information failure around prototype wind farm design for offshore applications. The site addresses that gap by providing pre-consented, representative conditions similar to Round 3 offshore wind projects. If successful, the site will allow developers to test new components—including wave power generation equipment attached to turbines—and installation methods before commercial deployment. Two existing turbines near the coastline will act as test beds for new components, while five prototype turbines will be installed at least 2 km offshore. The first phase costs £18.5 million, funded by DECC, covering grid connection, an environmental monitoring station, and site infrastructure. This could accelerate the deployment of larger, more efficient offshore wind turbines, improving the reliability and cost-effectiveness of the UK’s renewable energy grid.
View original technical description
Narec's plans to develop an offshore wind farm site in the North Sea, comprising 20 ! pre-consented "pods", at which tenants may deploy their prototype or demonstration turbines and foundations. These pods will be in four rows, increasing in distance offshore and with water depths of 15, 35, 45 and 55 metres to allow testing of alternative installation and foundation types, as indicated below. It would provide an offshore wind demonstration site with conditions representative of typical Round 3 offshore wind projects. The first phase of this development comprises expenditure of £18.5 million, planned to be funded by DECC, and covering the cost of acquiring the two near shore turbines, together with building the onshore grid connection substation and an offshore environmental monitoring station and undertaking environmental monitoring prior to deployment of additional turbines in the offshore pods. Currently there is an information failure around the understanding of prototype wind farm design for offshore applications. The funding will also cover Narec support projects in wind and marine and site infrastructure development required. £4.35 SP will complement this government funding in 2011/12 to complete electrical infrastructure work required to form a connection point onshore for accepting the offshore energy generated. The two existing turbines which are about 1 km from the coastline are likely to be 1 used as 'test beds' for new components. It is not anticipated that they will 'appear' ! any different as their overall dimensions will remain the same and no changes are envisioned to their foundations however it is likely that equipment will be attached to the turbines for testing (possibly wave power generation). The five turbines located within the first row of the new demonstration site are expected to be 'prototypes' built 1' by manufacturers that cannot secure onshore sites for testing due to the size of the new turbines and possibly noise and visual issues. These turbines will be installed at I least 2km from the shoreline.
Plain English summaries and category classifications on this site are generated by AI and may not perfectly reflect the original research.
Is something wrong? Let us know